BEI Projects

مشاريع مصنع البركة للصناعات الهندسية

A New Project, A New Challenge

With every project, our team strives not only to deliver exceptional results but also to build lasting partnerships rooted in trust, collaboration, and excellence.

New Cairo Bridge Construction Project

Total weight in tons: 350 TON.

Assigning Authority: HAS.

Job Description: Construction of a steel bridge girder with a length exceeding 12 meters.

North Luxor Axis Project

Total weight in tons: 450 TON.

Assigning Authority: HAS.

Job Description: Construction of a steel bridge girder with a length exceeding 12 meters.

Black Sand Factory Project

Total weight in tons: 350 TON.

Assigning Authority: HAS.

Job Description: Construction of a metal structure for the crushing unit.

Construction Project of Al-Bisha Cement Factory. Kingdom of Saudi Arabia.

Total weight in tons: 45 TON.

Assigning Authority: Intermaint Manufacturing Company.

Job Description: Construction of the cooling unit for the cement factory.

Manufacturing and Installation Project of the Feed Factory. Matrouh City.

Total weight in tons: 250 TON.

Assigning Authority: Famsun Egypt Industry for Contract.

Job Description: Construction and installation of silos for storing feed.

JUTON PAINTS FACTORY PROJECT

Total weight in tons: 250 TON.

Assigning Authority: HAS.

Job Description: Construction of metal structures for the paint mixing unit.

Manufacturing and installation project of Ezz Dikheila Iron And Steel.

مشروع تصنيع وتركيب شركة عز الدخيلة للحديد والصلب.

Total weight in tons: 175 TON.

Assigning Authority: Intermaint Manufacturing Company.

Job Description: Manufacturing and installation of lime factory hopper.

Mostakbal Misr Project.

Total weight in tons: 126 TON.

Assigning Authority: HAS.

Job Description: Construction of pipelines with a length of 50 meters and a diameter of 113 inches.

Bashtil Train Station Project.

مشروع محطة قطار بشتيل

Total weight in tons: 130 TON.

Assigning Authority: HAS.

Job Description: Construction of a 100- meter-long steel structure for the station .

Desalination plant Of Sharq El-tafriaa – Port said.

محطة تحلية المياه في شرق التفريعة - بورسعيد

Total weight in tons: 160 TON.

Assigning Authority: AL-Baraka Engineering Industries (BEI).

Job Description: Manufacturing and installation structure for the main tank and chemical building handrails.

Installation project of mostakbal misr for grain storage silos.

مشروع مجمع صوامع مستقبل مصر لتخزين الحبوب

Total weight in tons: 400 TON.

Assigning Authority: Famsun Integrated Solution Provider.

Job Description: Installation of silos for storing grains.

Manufacturing and installation project of Elsharqia Feed Factory in Hihya City.

مشروع تصنيع وتركيب مصنع أعلاف الشرقية في مدينة ههيا.

Total weight in tons: 300 TON.

Assigning Authority: El-Sharqia Feed Factory for Industry.

Job Description: Construction and installation of packaging and storage lines.

Manufacturing and installation project of metal structures for the Saudi Pharmaceutical Company in El Ain El Sokhna.

Total weight in tons: 220 TON.

Assigning Authority: Saudi Pharmaceuticals Company .

Job Description: Construction and installation of metal structures .

Construction of Al-Firdous Bridge Project.

Total weight in tons: 500 TON.

Assigning Authority: HAS.

Job Description: Construction of a steel bridge girder with a length exceeding 12 meters.

CORAL NURSERY-SHUSHAH ISLANDNEOM-KINGDOM OF SAUDI ARABIA.

Total weight in tons: 94 TON.

Assigning Authority: HAS.

Job Description: Construction and installation of metal structures .

Mobile Car Wash Project.

Total weight in tons: 50 TON.

Assigning Authority: ALNASR SERVICES COMPANY.

Job Description: Construction and installation of metal structures frames .

Albaraka Group

البركة جروب

EGY

مصر

KSA

السعودية

Scroll to Top